# Installation: overall procedure

[Home](/articles/clean-power-vfd-publication/home) » [Installing the VFD](/articles/clean-power-vfd-publication/installing-the-vfd) » Installation: overall procedure

* * *
 
The following steps list the sequence to be followed during installation.

Install the product following this sequence and check the operational status.

For more information on each step, refer to the sections below.

1. Product identification.
    * Check that the [product part number](/articles/clean-power-vfd-publication/understand-the-clean-power-vfd-part-number) is understood and the features match the application.
2. Unbox your Clean Power VFD.
    * Stock, carry, and unpack the Clean Power VFD with caution.
3. Select the installation location.
    * Check that the [environmental conditions](/articles/clean-power-vfd-publication/application-environment) are within specifications.
4. Follow the [instructions to mount](/articles/clean-power-vfd-publication/mounting-instructions) your Clean Power VFD onto its support.
5. Follow the [instructions to wire](/articles/clean-power-vfd-publication/wiring-power-connections) properly and safely the power cables on both the input and output sides.
6. Follow the [recommendation](/articles/clean-power-vfd-publication/wiring-power-connections)s for an efficient grounding
7. Follow the [instructions](/smart/project-clean-power-vfd/control-terminals-blocks-features)to wire properly and safely the control signals
8. Before powering up, follow the [verification checklis](/articles/clean-power-vfd-publication/check-list-before-starting-the-clean-power-vfd)t.
9. Switch on power to the Clean Power VFD.
10. Follow the [instructions](/articles/clean-power-vfd-publication/get-the-mobile-app) to set up the Clean Power VFD.
11. Before the operation, perform a [test sequence](/articles/clean-power-vfd-publication/test-run).